data-video-type="2">
DJI_0047proekb5-CMYK-Resized
ON SITEON TIME

IN THE HEART OF MEDITERRANEAN

Reliable Ship Repairs & Construction in Greece for over 50 years

PLAY THE VIDEO
PAUSE THE VIDEO
01 EXPLORE

Ship building on our slipways (passenger ferries and tankers), ship recycling by use of the scrap shear plant and various types of ship repairs have been conducted alongside our wharfs.

Conversion of single hull tankers to double hull, high pressure hydro blasting, coating of ballast & cargo tanks, holds and decks, seals’ replacements afloat, propeller removals and repairs afloat, crankshaft replacements, cranes’ slewing bearings’ renewals, piping, steel renewals and extended machinery repairs are only some of the extensive list of the services provided at KDC.

001
200m

LONG MAIN PIER

002
5 - 13m

DRAFT

003
110m

TWO SLIPWAYS / CONSTRUCTION SITES

004
WORKSHOPS

MACHINERY, PLATE, PIPING, CARPENTRY, BLASTING, PAINTING

005
SHIP RECYCLING

ONE SCRAP SHEAR PLANT

Kynosoura Dockyard provides reliable repair services & operations for commercial fleets.

Ship building on its slipways (passenger ferries and tankers), ship recycling by use of the scrap shear plant and various types of ship repairs have been conducted alongside its wharfs.

Conversion of single hull tankers to double hull, high pressure hydro blasting, coating of ballast & cargo tanks, holds and decks, seals’ replacements afloat, propeller removals and repairs afloat, crankshaft replacements, cranes’ slewing bearings’ renewals, piping, steel renewals and extended machinery repairs are only some of the extensive list of the services provided at KDC.

03 LOCATION

Kynosoura Dockyard is located in one of the busiest ship repair zones in the Mediterranean.

by_ferry
BY FERRY

FROM: Perama Coast
TO: Paloukia Port (main port of Salamis)
15 mins sailing and 10 mins driving

Screenshot 2023-07-20 at 7.23.05 PM
BY SERVICE BOAT

FROM: Perama Coast
TO: KDC
15 mins sailing

Screenshot 2023-07-21 at 1.11.25 AM
NEAREST AIRPORT

FROM: Athens Airport
TO: Perama Coast
45 mins driving

kynosoura01-edited
04 FACILITIES

About 40,000m² operational area with 250m sea front and 5-13m drafts capable of accommodating up to nine vessels; a 200m long main pier, two building slipways for up to 110m Loa ships, crane service as well as provision of electricity, ballast water, fresh water and compressed air; 8,000m2 of floor space including machinery, plate, piping, blasting & painting workshops and a scrapping facility.

 

Yard-Layout-Generic-v2.0
Κυνόσουρα, Αμπελάκια Σαλαμίνας, Ελλάδα